D1trout wrote: BTW, how do you add the "clicky" to your post?
Click on the "reply to topic" at the bottom of the string>
Click on the box that shows a chain - its the 10th icon from the left>
Follow the instructions and paste the entire URL for the link>
Then enter the word "clicky" in the "text you want to be clickable>
Then click finished>
return to your posting
Posted By: D1trout
on 06/19/14 04:38pm
Thanks, 67, good clear directions, as always.
Dick
Posted By: Michael 111
on 06/20/14 01:45pm
one step further in building the upstairs cabinets
holes and dents included they will stay and pay homage to the age of the camper, recycling at work.
will probably add a shelf half way up once i have the other side to this stage
A big rubber mallet to get it all in shape once the skin is in and we are good to go
Cheers
Posted By: cajunavion
on 06/21/14 09:12am
Howdy!
The plumbing continues with the layout of inside
of the bathroom. I took Garrys advise and rerouted
the kitchen sink under the shower pan. The toilet tank
has been removed and so drops through to
the macerator below.
Posted By: cajunavion
on 06/21/14 10:16am
The shroud and shower pan get carbon fibered.
Posted By: cajunavion
on 06/21/14 10:19am
The shroud and pan get replaced after the pedestals
and interior plumbing are finished.
Posted By: cajunavion
on 06/21/14 10:21am
The aluminum extrusion for the sidewall is clencoed
in place and the shroud is riveted.
Posted By: cajunavion
on 06/21/14 10:24am
After all work to return the original aquamagic toilet
to service, a new 310, which fits much better than expected
is put in place, sink mounted, final plumbing attached.
Posted By: cajunavion
on 06/21/14 10:27am
The 80/20 posts are installed and polycarbonate panels
are installed.
Posted By: cajunavion
on 06/21/14 12:15pm
The Grand unveiling and Jane smiles and we all
simile. A modern interpretation of the orignal design.