foxxxnick
USA
New Member
Joined: 08/04/2023
View Profile
Offline
|
newbie here.There's a question that's been bugging me for a while now. Maybe someone knows the answer.
Here is a 100amp MPPT: https://www.renogy.com/rover-100-amp-mppt-solar-charge-controller/ It's the biggest single MPPT I can find. When it's maxed out, can I add another MPPT in parallel to the same battery bank? If not, how do you get 200amps into one bank of batteries?
|
foxxxnick
USA
New Member
Joined: 08/04/2023
View Profile
Offline
|
I'm sorry the link may not work.
|
opnspaces
San Diego Ca
Senior Member
Joined: 12/22/2004
View Profile
Offline
|
Link
2001 Suburban 4x4. 6.0L, 4.10 3/4 ton
2005 Jayco Jay Flight 27BH
1986 Coleman Columbia Popup.
|
Bobbo
Wherever I park
Senior Member
Joined: 09/16/2007
View Profile
Good Sam RV Club Member
Offline
|
foxxxnick wrote:newbie here.There's a question that's been bugging me for a while now. Maybe someone knows the answer.
Here is a 100amp MPPT: https://www.renogy.com/rover-100-amp-mppt-solar-charge-controller/ It's the biggest single MPPT I can find. When it's maxed out, can I add another MPPT in parallel to the same battery bank? If not, how do you get 200amps into one bank of batteries?
foxxxnick wrote:I'm sorry the link may not work.
You have to have a minimum number of posts before you are allowed to post links. I forget the number, but keep posting, and you will get there quickly.
In answer to your question, I have always read that you can parallel multiple MPPT controllers, but I have never had a need to try it, myself.
Bobbo and Lin
2017 F-150 XLT 4x4 SuperCab w/Max Tow Package 3.5l EcoBoost V6
2017 Airstream Flying Cloud 23FB
|
3 tons
NV.
Senior Member
Joined: 03/13/2009
View Profile
Offline
|
foxxxnick wrote:newbie here.There's a question that's been bugging me for a while now. Maybe someone knows the answer.
Here is a 100amp MPPT: https://www.renogy.com/rover-100-amp-mppt-solar-charge-controller/ It's the biggest single MPPT I can find. When it's maxed out, can I add another MPPT in parallel to the same battery bank? If not, how do you get 200amps into one bank of batteries?
The long and the short answer are both yes, in the same way as your vehicle’s alternater charging concurrent with your solar or another source - your battery really doesn’t care..
In my case my system has grown over time to now three controllers…
3 tons
|
|
CA Traveler
The Western States
Senior Member
Joined: 01/03/2004
View Profile
Offline
|
You can parallel multiple chargers but they need to be compatible for maximum charging. For example I have 3 chargers for my batteries: solar, alternator and charger (with gen running) and while this works OK they may not be 100% compatible. And solar is the only one with a remote voltage sense probe on the house battery.
However, I recommend that you buy a MPPT controlled that is designed for parallel connections with a single controler. ie They are connected by a small data cable with a single point of control.
2009 Holiday Rambler 42' Scepter with ISL 400 Cummins
750 Watts Solar Morningstar MPPT 60 Controller
2014 Grand Cherokee Overland
Bob
|
ktmrfs
Portland, Oregon
Senior Member
Joined: 06/22/2005
View Profile
Offline
|
not sure about the controller the OP has, but midnite solar "kid" controllers are designed to be paralleled if needed. Two can be set up with one as master the other as slave. if you have more than two, they can be "daisy chained" with one as master and it passes info to the next in line, that one passes info to the next in line etc.
I have two kids, master is the roof solar setup, slave is for the portable panels. works great.
2011 Keystone Outback 295RE
2004 14' bikehauler with full living quarters
2015.5 Denali 4x4 CC/SB Duramax/Allison
2004.5 Silverado 4x4 CC/SB Duramax/Allison passed on to our Son!
|
3 tons
NV.
Senior Member
Joined: 03/13/2009
View Profile
Offline
|
To expand on my previous, I have three solar controllers (*and two converter-chargers) , two are MPPT while the other is PWM, each one from a different maker (one manufacturer is now defunct) and this evolved over time…Each controller is ignorant of the existence of the other two and they all do their job without a hitch…To a degree, I attribute this performance to the fact that each one is voltage programmable which is ideal for single charge voltage requirement LFP batteries. However, potentially problematic in a multi-voltage stage wet-cell config…
*due to system evolution…
Were I to develop this entire system from scratch, I would have gone with common maker controllers merely in the interest if simplicity…
3 tons
|
KD4UPL
Swoope, VA
Senior Member
Joined: 03/16/2008
View Profile
Good Sam RV Club Member
Offline
|
Magnum also makes a 100 amp controller, the PT-100. They will communicate when used in multipole. Usually just adding multiple controllers will work but they work better if networked.
As for getting 200 amps into a battery, it needs to be capable of accepting that much current. As it charges it will take less and less charge.
|
foxxxnick
USA
New Member
Joined: 08/04/2023
View Profile
Offline
|
Thank you
|
|